Technician in a protective suit and respirator in a plant room

Asbestos sampling experts in Luxembourg

Sampling, laboratory analysis
and regulatory support

  • Fast response
  • Certified laboratory
  • Compliant report
1Nov 2026

New rule: since 1 November 2026, asbestos surveys before demolition, maintenance or renovation of premises built before 2001 must be carried out by a surveyor holding a certificate of competence.

Source: Grand-Ducal Regulation of 19 May 2026, Inspection du travail et des mines (ITM).

Read the ITM notice →
Free check

What is the asbestos risk in your home?

Get a first estimate of the risk for your building, before you even request a survey.

Take the check

5 questions · Under 30 seconds · Free and anonymous

Appointment

Book your intervention with a free quote.

Pick a date and tell us what you need. Reply within 24 hours.

1Date

Pick a date

When can we come by?

MOTUWETHFRSASU

No date chosen yet.

Preferred time

2Building

Building type

3Contact

Your request is free and without obligation. Your data stays confidential. Privacy

Method

Our method in 5 steps

From the first call to the final report, one contact person handles your file.

  1. First contact

    Tell us about your project.

    Reply within 24 h
  2. Tailored quote

    A clear price for your building.

    Free, no obligation
  3. On-site sampling

    Samples taken safely.

    Safe intervention
  4. Laboratory analysis

    Samples analysed in the lab.

    Accredited lab
  5. Analysis report

    Results, photos and locations.

    Clear and compliant
Asbestos in the buildingScroll to explore
Overview

What hides
inside your building.

Scroll: the building opens up to reveal twelve areas where asbestos may be present.

Material in good condition that is left alone carries little risk. The danger comes from fibres released when it is drilled, sanded, broken or removed.

+3,500recorded uses of asbestos, according to Brussels Environment. Source of the figure
101112789456123
A few examples · not an exhaustive diagram
Scroll to explore
Services

A survey matched to your project

Surveys, sampling and analysis to support your project.

Room under renovation with open stud walls

Before renovation or alteration

A full survey before your works.

  • Report to hand to your contractors
  • Advice on next steps

For owners, property managers, architects, builders

Demolition of an office building in Kirchberg, Luxembourg

Before demolition

Prepare a full or partial demolition.

  • Full survey of the building
  • Location on plans and photos
  • Basis for the removal plan

For developers, municipalities, demolition firms

Brick detached house with garden

Sale or purchase

Clarity for your property project.

  • Clear facts for seller and buyer
  • Useful for negotiation and budgeting
  • Report to add to the sale file

For private owners, estate agents, notaries

Sample slide under a laboratory microscope

Single-sample test

A targeted analysis of a suspect material.

  • One or more materials concerned
  • Laboratory analysis
  • Result for the sampled material

For private and professional clients

FAQ

Frequently asked questions

Can't find your answer? Call us on +352 30 81 31.

01Is my building affected?

Asbestos has been banned in Luxembourg since 2001. Any building built before then may contain it, even if it has been renovated since: fibre-cement roofing and cladding, floor tiles and their adhesives, pipes, pipe lagging, suspended ceilings.

A building built after 2001 should not contain asbestos.

02Is a survey mandatory before building works?

Yes. Before demolition, renovation or maintenance of a building built before 2001, materials likely to contain asbestos must be identified. If no reliable information exists, a survey must be carried out before work starts.

Since 1 November 2026, this survey must be done by a surveyor holding a certificate of competence (Grand-Ducal Regulation of 19 May 2026).

03How much does a survey cost?

The price depends mainly on the number of materials to sample, the size of the building and the turnaround you need. The quote is free and without obligation: describe your project in the booking form.

04How long until I get the results?

It depends on the laboratory and the number of samples. We state the turnaround in the quote; urgent analysis is available on request.

05What if asbestos is found?

Do not touch or drill the material. Depending on its condition and your project, it can stay in place or must be removed. Removal is reserved for asbestos removal companies authorised by the ITM. Our report gives them their starting point.

06Why survey before a sale or purchase?

Even when it is not required, the report tells the buyer what they are buying and helps budget for any removal works. For the seller, it shows transparency and makes negotiation easier.

07How does the intervention work?

No preliminary visit is needed: we come straight to take the samples. We go through the building from the roof to the cellar and take a small sample of each suspect material. For a house, it takes about 1 h 30.

08Is sampling dangerous for occupants?

Not when done properly. We wet the material, remove a small amount with suitable tools and seal the sampling point. Just stay out of the room while we sample; you do not need to leave the building.

09What does the report contain?

The list of materials checked, their location on plans and photos, the laboratory result for each sample and our recommendations for next steps. You can hand it straight to your contractors, the buyer or the removal company.

10Which area do you cover?

The whole Grand Duchy of Luxembourg, from our base in Nospelt.